OverviewDaily Task ScheduleTech StackMetrics
◉Home☰Schedule⚙Tech★Metrics↑Top
← Back to Calendar
Saturday, September 19, 2026

Client CMS Admin Batch & Site v2 Initial Build

Processed a batch of client CMS admin-panel updates (form edit fixes, list reordering, seed-data hygiene) and produced the initial scaffold of the refreshed site v2 so the new front-end lands as one coherent unit on the next push.
CMS Admin Site v2 Build
10
Admin Pages Updated
4
CMS Modules Batched
35
Build Files Scaffolded

Task Summary

Technical Details

CMS Admin Batch

Worked through the admin panel page by page: repaired edit-form bindings so saves return cleanly, applied the requested row ordering, and removed the duplicate seed rows that kept reappearing. Confirmed each save path returns a clean response before moving on.

Site v2 Scaffold

Built the v2 skeleton — home, interior, section and admin templates all sharing one header/footer and a single CSS variable design system — so the refreshed front-end can be staged once and pushed as one unit with the admin batch.

AI-Assisted Tools

Claude Pro GPT-4 Turbo
Full-Stack Engineering Report — September 2026 — Confidential