OverviewDaily Task ScheduleTech StackMetrics
◉Home☰Schedule⚙Tech★Metrics↑Top
← Back to Calendar
Thursday, October 29, 2026

Microsite Production Restore & Brand Collateral

Restored/uploaded the client microsite’s production tree (old build), prepared the new favicon for the next deploy, and finalised a client brand’s visiting cards, six PDFs and six social creatives.
Deploy Branding Design
1
Production Restore
6
PDFs Edited
6
Social Creatives

Task Summary

Technical Details

Production Restore

Every checked file returned the same Last-Modified timestamp, indicating a bulk upload/extract rather than an incremental deploy. The live build still carries GTM, Clarity, Make.com and the old hashed assets; the 23 Oct CSS sits alongside the 29 Oct HTML/JS.

same timestamp across files | hashed asset bundles | mixed build versions

Favicon

The new favicon is prepared locally with its MD5 recorded for the next deploy check. It still needs a <link rel="icon"> tag, an upload to assets/ and a LiteSpeed cache purge.

dimensions checked | checksum recorded | not live

Brand Collateral

Two visiting-card variants (gold/charcoal and charcoal/white), six edited PDFs with the brand name/logo and updated contact/RERA blocks, and a six-piece social launch set — all exported print-ready with fonts embedded.

300 DPI CMYK 3 mm bleed | PDF/X-1a | 4 posts 1080x1080 + 2 stories 1080x1920

Open Items

Production still serves the old build, there is no SSH access to the production host, the favicon is not live, and asset versions are mixed. The project microsite zip from 28 Oct is still downloadable.

old build live | no SSH | favicon pending | zip still public

Work Done Using Premium AI Chatbot

AI-Assisted Tools

Claude Pro Gemini Advanced GPT-4 Turbo